Lodgemore Dredging – Final report

Lodgemore Dredging – Final Report By the time this piece is published Land & Water’s (L&W) 15 tonne amphibious excavator will have departed the Lodgemore Pound bound for its new contract in Chichester. Elephant style wash-down Picture one shows the big green machine shortly before it scrambled up the steep bank it had created along […]

Lodgemore Dredging – Final report

Lodgemore Dredging – Final Report By the time this piece is published Land & Water’s (L&W) 15 tonne amphibious excavator will have departed the Lodgemore Pound bound for its new contract in Chichester. Elephant style wash-down Picture one shows the big green machine shortly before it scrambled up the steep bank it had created along […]

Wallbridge to Lodgemore Dredging Update No.1

Lodgemore Dredging Report No.1 The arrival of the Land & Water Dredging Team at Lodgemore on Monday 11th August signalled the start of the second phase of canal restoration between Stroud Brewery Bridge and Lodgemore Mills. Back in Stroud Land & Water’s Senior Site Manager Chris Spencer (pictured right) has recently completed a busy couple […]

Wallbridge to Lodgemore Dredging Update No.1

Lodgemore Dredging Report No.1 The arrival of the Land & Water Dredging Team at Lodgemore on Monday 11th August signalled the start of the second phase of canal restoration between Stroud Brewery Bridge and Lodgemore Mills. Back in Stroud Land & Water’s Senior Site Manager Chris Spencer (pictured right) has recently completed a busy couple […]